2.5 Programmable working area limitation: G25,G26,WALIMON,WALIMOF

      Fig.2.6 G25/26 Programmable working area limitation

1. G25 X… Z…:Values for the lower working area limitatio

2. G26 X… Z…:Values for the upper working area limitation

3. WALIMON:Working area limitation ON

4. WALIMOF:Working area limitation OFF

Example:

N10 WALIMON                                 : Working area limitation ON

N20 G25 X-20Z-20                             : Values for the lower working area limitatio

N30 G26X20 Z20                                ; Values for the upper working area limitation

N40 G94 G01 X0 Z0 F100                  ; Within the working area

N50 G01 X30 Z30                               : Without the working area

N60  WALIMOF   ; Working area limitation OFF

Note

1. The upper limit of G26 working area must be greater than the lower limit of the G25 working area.

2. The coordinate of working area limitation are changed follow current work offset, including the part of programmable and settable.

3. The X and Z after G25/G26 can not be omitted at the same time, and X value is always for radius.

4. G25/G26 working area is enclosed range, for the omitted coordinate there is no limitation.

5. G25,G26,WALIMOF and WALIMON must require separate block.

Example:

N20 G25 X-20                                           ; Z is omitted

N30 G26 X20 Z20

For Z direction, it is only the upper limit and without lower limit.

0 (0)
Article Rating (No Votes)
Rate this article
Attachments
There are no attachments for this article.
Comments
There are no comments for this article. Be the first to post a comment.
Full Name
Email Address
Security Code Security Code
Related Articles RSS Feed
5.3.1 Groove CYCLE93
Viewed 4249 times since Fri, Aug 26, 2016
1.3 Subroutine
Viewed 2394 times since Thu, Aug 25, 2016
2.8 Feedrate: G94,G95,G96,G97
Viewed 33892 times since Thu, Aug 25, 2016
1.4 Program jumps
Viewed 25827 times since Thu, Aug 25, 2016
2.6 Work plane G17/G18/G19
Viewed 6820 times since Thu, Aug 25, 2016
5.3.3 Rough turning CYCLE95
Viewed 11798 times since Fri, Aug 26, 2016
5.3.6 Copy cutting CYCLE99
Viewed 5699 times since Fri, Aug 26, 2016
2.10 Dwell Time: G04
Viewed 2413 times since Thu, Aug 25, 2016
2.2 Dimensions in metric units and inches: G70/G71
Viewed 2277 times since Thu, Aug 25, 2016
2.3 Radius / diameter: DIAMOF/DIAMON
Viewed 3276 times since Thu, Aug 25, 2016